San Dimas, CA
Find out what you are actually dealing with
Half the people who ask for a replacement need a repair, and a handful of the people who ask for a repair need a replacement. An hour on the roof sorts that out.
Describe the inspection job
Three questions, then the address. Up to three San Dimas contractors who do this work.
You are on the list.
No provider in San Dimas is taking requests through this service yet. We are lining them up, and yours is kept until one can.
- Nobody gets your details yet. Your request stays with us and is not passed to any company.
- One email when someone can help. When a provider covering your area can take it on, we email you once and ask whether you want that company, by name, to contact you.
- Deleted after 90 days. If nobody can take it on, or you do not say yes, your contact details are deleted 90 days after your request.
- You decide, or you do not. There is nothing to cancel and nothing to pay us.
Nobody will call you about this request unless you say yes to a company by name.
Before you let anybody on the roof
The things worth pinning down on a inspection job. A contractor who has not raised them has not looked properly.
- An estimated number of years left in the covering
- Whether the fee comes off the job if you proceed
- A written report, not a verbal summary
- Photographs of anything they flag
- Whether the inspection includes going into the attic
Twice a year is the standard advice, and almost nobody does it. Once after the worst weather of the year is a reasonable compromise.
A thorough look covers the covering, the flashings, the penetrations, the gutters, the ventilation and the attic side of the deck. If nobody went into the attic, half the inspection did not happen.
Either way, ask for photographs. A report with pictures of your actual roof is worth ten times one with a tick-box condition rating.
Locally
The second problem is the marine layer keeping the north slope damp. Damp that arrives every morning and leaves by lunchtime is worse for a roof than rain, because nothing ever fully dries between one and the next.
About inspection here
How long does a re-roof take?
Two days is typical for asphalt. Add days for steep pitch, multiple layers to strip, tile work, or a roof with a lot of valleys and penetrations.
Should I repair or replace?
It depends almost entirely on how much life is left in the material. Ask any contractor who inspects it to give you a number of years and a reason. If two of them independently say the same thing, believe it.
Can I just put a new roof over the old one?
Codes in most places allow two layers. That does not make it wise. You lose the chance to see the deck, and the next roofer has twice as much to remove.
It is leaking right now. What do I do?
Move what you can out of the way, put a bucket under it, and if there is a bulge in the ceiling put a small hole at its lowest point to let the water out in one place rather than bringing the whole panel down. Then mark your request as an emergency — those go out first.
Start with a free estimate
No cost. We email you once when a provider near you can take it on.
